[Craftsman Cuts Column] Measures for Achieving S&OP
It is important to realize a mechanism for synchronizing plans as if they were a single plan!
In the previous column, I explained that one of the issues to be addressed in SCM is that the business plan based on the budget and the execution plan based on that business plan do not form a single PDCA cycle. To realize S&OP, a planning mechanism is needed where the business plan and the execution plan are always synchronized. An effective means to achieve this is to implement an advanced SCM planning system, such as an APS (Advanced Planning System), which allows for the creation and management of the execution plan and business plan within the same framework. However, even if the current system creates and manages the business plan and execution plan separately, there are ways to synchronize the two plans. [Overview] ■ The concept of One Plan ■ Data structure necessary for S&OP ■ Scenario management ■ Knowledge accumulation ■ Finally *Detailed content of the column can be viewed through the related links. For more information, please feel free to contact us.
- Company:NTTデータ関西 法人分野
- Price:Other